Water supply system in El Baha region (KSA) for improving the water supply system (10362 km2 Served area pipeline).
In Association with Bect Consulting Firm
The project objectives are to rehabilitate the water supply system , Master Plan, Preparing Design Reports, Hydraulic Modelling and Tender Design of Water networks of Al-Baha Region and its 10 Governorates. Total pipe length is 4000 km in( Baha – Mekhwah – Ghamed el zanad – Beljershy- Aqeeq- Qelwa – Bani Hassan – Hagra –Mandaq –Qara ) by the Ministry of Environment , Water & Agriculture. The investment cost for the proposed project is at SR 820 million.