Water supply system in El Baha region (KSA) for improving the water supply system (10362 km2 Served area pipeline).

Project Details :-

In Association with Bect Consulting Firm 

The project objectives are to rehabilitate the water supply system , Master Plan, Preparing Design Reports, Hydraulic Modelling and Tender Design of Water networks of Al-Baha Region and its 10 Governorates. Total pipe length is 4000 km in( Baha – Mekhwah – Ghamed el zanad – Beljershy- Aqeeq- Qelwa – Bani Hassan – Hagra –Mandaq –Qara ) by the Ministry of Environment , Water & Agriculture. The investment cost for the proposed project is at SR 820 million.

Back to Website